• New terminal upgrade and installation of run way lighting
• Upgrade infrastructure, conduits and pits
• Installation of self check in terminals
• Upgrade terminal, car park lighting to LED
• General maintenance of light and power installations
• Design and manufacture LED light boxes for arrivals
information kiosks
• Installation of underground conduits for future fire station
and arrivals building
• Under bore 300mtrs and install conduits, trafficable
and concrete pits
• Installation of security cameras on Taxiway
Principal Sub Contractor (Electrical) for Ballina Shire Council:
• Ballina Byron Gateway airport maintenance
• Water and Sewerage treatment works,
• Water filtration plants,
• Quarries,
• U.V plants
• Pump stations both water and sewerage.
• Construction, supply and installation of new control cabinets.
• Up grading of existing switch gear
• Control circuits
• Telemetry cabinets.
General Installations:
• Servicing, upgrading control cabinets for treatment
works and pumping stations
• Refurbishment of old control cabinets.
• Construction of new control cabinets using either
aluminium / zinc powder coated or 316 stainless steel
• Installation of control cabinets / pumps / and switch gear.
• General contracting
Supply of all electrical services for the demolition and refurbishment of the Brook farm Factory in Byron Bay works included:
- Main switch board design, manufacture and install
- Office and Factory fit out
- Factory and office lighting
- Exit and emergency lighting
- Factory Pendant power design, manufacture
and installation
- Production line maintenance and repairs
- General installation and maintenance
FRESH AT HEART HYDROPONIC FARM
Supply of all electrical services for fresh at heart hydroponic farm works included
- Main switchboard design, manufacture and install
- Irrigation pumps and controls
- Temperature sensors and controls
- Lighting design and installation
- Wire Growing sheds for climate control
- Under boring of electrical services
- 3 phase wiring
- Exit and emergency lighting
The supply of all electrical services for the demolition and refurbishment of the new Ballina fair Shopping centre completed in February 2008 works included
• Main Switchboards
• Shop fit outs
• Corridor lighting
• Exit and emergency